Getting knowledge of the Huawei H12-425 exam structure and question format is vital in preparing for the Huawei Certified ICT Professional - Data Center Facility Deployment certification exam. Our Huawei HCIP-Data Center Facility Deployment sample questions offer you information regarding the question types and level of difficulty you will face in the real exam. The benefit of using these Huawei H12-425 sample questions is that you will get to check your preparation level or enhance your knowledge by learning the unknown questions. You will also get a clear idea of the exam environment and exam pattern you will face in the actual exam with the Huawei Certified ICT Professional - Data Center Facility Deployment Sample Practice Test. Therefore, solve the Huawei HCIP-Data Center Facility Deployment sample questions to stay one step forward in grabbing the Huawei Certified ICT Professional - Data Center Facility Deployment credential.
These Huawei H12-425 sample questions are simple and basic questions similar to the actual Huawei HCIP-Data Center Facility Deployment questions. If you want to evaluate your preparation level, we suggest taking our Huawei Certified ICT Professional - Data Center Facility Deployment Premium Practice Test. You might face difficulties while solving the real-exam-like questions. But, you can work hard and build your confidence on the syllabus topics through unlimited practice attempts.
Huawei H12-425 Sample Questions:
a) Charging
b) Self-discharge
c) Equalizing Charge
d) Charging test
(Multiple choice)
a) Natural cooling on the water side
b) Direct ventilation and natural cooling
c) Chilled water cooling scheme
d) Natural cooling by runner heat exchange
a) Fan noise is too loud
b) Pipeline condensation
c) The drainage capacity of the equipment is significantly reduced
d) Fan blocked
(Multiple choice)
a) Battery Low Voltage
b) Overload
c) Mains input interruption
d) Mains low voltage
a) Perform "shut down operation" on the UPS twice.
b) Perform "shut down operation" on the UPS only once
c) Turn off the input circuit breaker of the UPS
d) Perform "shut down operation" on all UPS
a) After the BCB port of dry contact card is connected, the BCB port can be used only if it is enabled on the monitoring software.
b) The EPO port can be normally open or normally closed.
c) The UPS dry contact card can be used to detect the switch status of the battery system.
d) The dry contact card cannot detect the status of an external battery switch.
a) 40
b) 12
c) 32
d) 24
a) 1.75V
b) 1.60V
c) 1.67V
d) 1.80V
(Multiple choice)
a) UPS5000-A
b) UPS5000-E
c) PX250 series
d) APM series
a) System Settings
b) Maintenance
c) Home
d) Monitoring
Answers:
Question: 01 Answer: c |
Question: 02 Answer: a, b, d |
Question: 03 Answer: b |
Question: 04 Answer: a, b |
Question: 05 Answer: a |
Question: 06 Answer: b, c |
Question: 07 Answer: d |
Question: 08 Answer: a |
Question: 09 Answer: b, d |
Question: 10 Answer: a |
Note: For any error in Huawei Certified ICT Professional - Data Center Facility Deployment (H12-425) certification exam sample questions, please update us by writing an email on feedback@certfun.com.