TMSTE Dumps, TMSTE PDF, TMSTE VCE, EXIN TMap Suite Test Engineer VCE, EXIN TMap Suite Test Engineer PDFThe purpose of this Sample Question Set is to provide you with information about the EXIN TMap Suite Test Engineer (TMSTE) exam. These sample questions will make you very familiar with both the type and the difficulty level of the questions on the TMSTE certification test. To get familiar with real exam environment, we suggest you try our Sample EXIN TMap Suite Test Engineer Certification Practice Exam. This sample practice exam gives you the feeling of reality and is a clue to the questions asked in the actual EXIN TMap Suite Test Engineer Foundation certification exam.

These sample questions are simple and basic questions that represent likeness to the real EXIN TMap Suite Test Engineer exam questions. To assess your readiness and performance with real-time scenario based questions, we suggest you prepare with our Premium EXIN TMSTE Certification Practice Exam. When you solve real time scenario based questions practically, you come across many difficulties that give you an opportunity to improve.

EXIN TMSTE Sample Questions:

01. According to TMap HD what does the element ‘Integrate’ mean in the process of building IT solutions?
a) all 'building blocks' have to be integrated
b) all disciplines must work better together to increase efficiency, speed and quality
c) all tools used have to be standardised to increase efficiency, speed and quality
d) all roles, such as designer, programmer and tester, must be able to be carried out by one person
 
02. You decide to test a process flow coverage-based. A coverage type has been chosen from the Process coverage type group. Which coverage type has been chosen?
a) Decision points
b) Boundary value analysis
c) Operational profiles
d) Paths
 
03. TMap uses the following two test approaches: experienced based and coverage based testing. Which type of testing belongs to experience-based testing?
a) Exploratory
b) Data
c) Appearance
d) Process
 
04. For a system, you want to test the degree to which the manual procedures interconnect with the automated information system and the workability of these manual procedures for the organisation.
To which quality characteristic does this description relate?
a) usability
b) connectivity
c) functionality
d) suitability
 
05. Using a tool ‘forces’ a standard way of working, disabling the human factor. What advantage does this create?
a) higher quality of testing
b) higher productivity
c) more happiness at work
d) expansion of testing options
 
06. Why is the checklist 'test design techniques’ used in the TMap Preparation phase?
a) to check the test basis for testability
b) to create test cases
c) to create the test strategy
d) to assign the test design techniques to the combination of quality characteristic and test depth
 
07. Usability testing has a great deal to do with the quality characteristic user friendliness. To which other quality characteristic does usability testing relate?
a) manageability
b) usability
c) reusability
d) portability
 
08. What does the quality characteristic manageability mean?
a) The degree to which the user is able to introduce enhancements or variations on the information system without amending the software
b) The ease and speed with which the information system can be resumed following a breakdow
c) The ease with which the information system can be placed and maintained in an operational condition.
d) The ease with which the information system can be adapted to new requirements of the user
 
09. When is a test environment considered as good?
a) if it is possible to determine to a sufficient degree whether or not the test object meets the previously set requirements
b) if it is set up and tested by qualified people
c) if it meets the previously set requirements
d) if it is as much as possible like the production environment and the test data is consistent
 
10. What should a tester do if an inconsistency is detected during the evaluation of the test basis?
a) make the test basis consistent
b) make the test infrastructure operational
c) make an assumption
d) report a defect

Answers:

Question: 01
Answer: b
Question: 02
Answer: d
Question: 03
Answer: a
Question: 04
Answer: d
Question: 05
Answer: a
Question: 06
Answer: a
Question: 07
Answer: b
Question: 08
Answer: c
Question: 09
Answer: a
Question: 10
Answer: d